Basic package 300 $
Delivered with an unique genesis block and a compiled Linux & Windows client.
Coin Logo, coin web site, seed node, daemon, windows desktop wallet
Name and abbreviation of your choice
Unique Merkle hash and Genesis block
Change Address Letter
Windows & Linux QT Wallets
Change coin parameters
Configurable parameters
Algorithm/Type : Scrypt / Sha256
Block reward : 50
Block halving : 210000
Total coin supply : 21000000
Premine : 0-2100000
Coinbase maturity (Number of blocks before a mined block can be spend) : 20
Number of confirmations (Number of blocks before a transaction is confirmed) : 6
Target timespan in minutes (Number of minutes before difficulty of the network is re-adjusted.) : 10
Target spacing in minutes(Number of minutes it should take to mine a block.) : 5
Additional options
Mac desktop wallet 100 $
Unix desktop wallet 100$
Android mobile wallet 200$
Iphone mobile wallet 200$
Mobile wallets maid SPV (simple payment verification) wallet, only downloads the block headers. Does not download the entire connects of the blockchain, saving phone drive space.
***********************
How to order
PM with coin coin parameters, graphics (optional)
Estimated delivery 1-2 days
***********************
Completed projects
1. Goldtoken proof of stake coin windows wallet created
Algorithm Scrypt
Type PoW/PoS
Coin name Goldtoken
Coin abbreviation GCT
Address letter T
RPC port 21774
P2P port 21773
Block reward 50 coins
Total coin supply 23333333 coins
Premine percent 10%
Premine amount 2333333 coins
PoS percentage 3% per year
Last PoW block block 10000
Coinbase maturity 20 blocks
Target spacing 64 seconds
Target timespan 1 block
Transaction confirmations 6 blocks
*********************
2. PIVX coin cloned, master nodes, Proof of Work, multisend, obfuscation
Algorithm Quark
Block Reward Blocks 2 - 151,200 250 PIV Blocks 151,201 - 259,200 50 PIV
Block Time 60 seconds with re-targeting after every block
Total Supply (from PoW phase) 43,166,500
Port 51472
Minted Confirmations 101
Transactions Confirmations 6
Proof of Work Schedule
Block 1 60k pre-mine for 6 master nodes
Blocks 2 - 43,200 20% master node | 80% to miner
Blocks 43,201 - 151,200 20% master node | 70% to miner | 10% proposals
Blocks 151,201 - 259,200 45% master node | 45% to miner | 10% proposals